Normalized for Mintlify from
knowledge-base/neurigraph-memory-architecture/hyperthyme-memory-framework/hyperthyme-master-project-checklist.mdx.Neurigraph Hyperthyme Artificial Memory Framework by Oxford Pierpont
Master Project Checklist
Project: Hyperthyme — Persistent Memory Layer for AI SystemsGoal: Build a fundable product with comprehensive documentation, working prototype, and investment-ready materials
Created: January 11, 2025
Phase 0: Foundation (Week 1-2)
Project Setup
- Create dedicated project repository (GitHub or GitLab)
- Set up project management tool (Linear, Notion, or GitHub Projects)
- Establish folder structure for all documentation
- Create README.md with project overview
- Set up version control and branching strategy
- Register domain name(s) for project
Core Documentation
- Technical Architecture Document (TAD) — Complete system design
- Product Requirements Document (PRD) — Features, user stories, specifications
- Glossary of Terms — Define all project-specific terminology
- Design Philosophy Document — Why Recall exists, core principles
Phase 1: Technical Documentation (Week 2-4)
System Architecture
- High-level architecture diagram
- Data flow diagrams
- Component interaction maps
- Infrastructure requirements document
Memory System Specifications
- Recall File Structure Spec — Folder structure, file formats, naming conventions
- Token Threshold Configuration — 50K token trigger logic
- Summary Generation Spec — How summaries are created, what they contain
- Keyword Extraction Spec — Extraction methodology, storage format
- Artifact Handling Spec — Compression, storage, retrieval of companion files
Defining Memory Specifications
- Defining Memory Detection Spec — Trigger patterns, classification logic
- Defining Memory Schema — Data structure for milestone/event memories
- Defining Memory Index Spec — How the always-warm index is maintained
Retrieval System Specifications
- Knowledge Graph Integration Spec — Node structure, relationships, navigation
- RAG Database Spec — Embedding strategy, vector storage, search methodology
- Search Cascade Logic — Keywords → Summary → Transcript → Artifacts
- Node Warming Spec — How nodes transition between hot/warm/cold states
- Cross-Project Search Spec — How global search differs from scoped search
Storage & Lifecycle
- Cold Storage Spec — Compression triggers, 7-day rule, background processes
- Warming Process Spec — How related memories are pre-loaded
- Storage Estimation Model — Projected storage needs at scale
Model Agnostic Layer
- Middleware API Spec — Endpoints, request/response formats
- MCP Integration Spec — How Recall exposes tools via Model Context Protocol
- Provider Abstraction Spec — How to swap between Claude/GPT/Gemini/etc.
Database Design
- Complete database schema (PostgreSQL recommended)
- Entity-relationship diagrams
- Index strategy document
- Migration scripts template
API Documentation
- RESTful API specification (OpenAPI/Swagger)
- Authentication and authorization spec
- Rate limiting and quota management
- Webhook specifications for integrations
- SDK design document (Python, JavaScript)
Phase 2: Business Documentation (Week 4-6)
Market Research
- Competitive Analysis — Mem0, Zep, Graphiti, LangChain memory, etc.
- Market Size Estimation — TAM, SAM, SOM calculations
- Target Customer Profiles — Who buys this and why
- Pricing Research — What competitors charge, willingness to pay
Business Model
- Monetization Strategy Document — Pricing tiers, revenue model
- Unit Economics Model — CAC, LTV, margins, break-even analysis
- Financial Projections — 3-year revenue/expense model (spreadsheet)
- Go-to-Market Strategy — Launch plan, channels, partnerships
Differentiation
- Unique Value Proposition (UVP) Document — Why Recall vs. alternatives
- Positioning Statement — One paragraph that captures the essence
- Competitive Moat Analysis — What’s defensible long-term
Phase 3: Legal & Compliance (Week 5-7)
Intellectual Property
- Provisional patent application (if applicable)
- Trademark search for “Recall” name
- Trademark application filing
- Document all proprietary methodologies
Legal Structure
- Choose business entity type (LLC, C-Corp, etc.)
- Incorporate the company
- Draft founder agreements (if multiple founders)
- Establish equity structure and vesting schedules
- Create IP assignment agreements
Compliance Documentation
- Privacy Policy — GDPR, CCPA compliant
- Terms of Service — Platform usage terms
- Data Processing Agreement (DPA) — For enterprise customers
- Security Whitepaper — How user data is protected
- SOC 2 Roadmap — Plan for eventual compliance certification
Data Handling
- Data retention policy
- Data deletion procedures (right to be forgotten)
- Encryption standards document
- Backup and disaster recovery plan
Phase 4: Product Development (Week 6-14)
MVP Definition
- MVP Scope Document — Exactly what’s in v0.1, what’s not
- User Stories — Detailed stories for MVP features
- Acceptance Criteria — How to know each feature is “done”
Development Milestones
Milestone 1: Core Storage (Week 6-8)
- Recall file creation (transcript + summary + keywords)
- Token counting and threshold triggers
- Basic folder structure and naming
- Manual search functionality
Milestone 2: Retrieval System (Week 8-10)
- Keyword search implementation
- Summary RAG integration
- Search cascade logic
- Basic API endpoints
Milestone 3: Knowledge Graph (Week 10-12)
- Node creation and relationship mapping
- Navigation/scoping logic
- Node warming implementation
- Cross-project search
Milestone 4: Defining Memories (Week 12-13)
- Detection triggers
- Defining memory index
- Timeline/milestone view
- Linking to source recall files
Milestone 5: Polish & Integration (Week 13-14)
- Cold storage compression
- MCP server implementation
- Multi-model testing (Claude, GPT, Gemini)
- Basic web dashboard
Quality Assurance
- Unit test suite
- Integration test suite
- Performance benchmarks
- Security audit checklist
- Load testing plan
Phase 5: Fundraising Materials (Week 12-16)
Pitch Deck
- Investor Pitch Deck — 10-15 slides covering:
- Problem statement
- Solution overview
- Market opportunity
- Product demo/screenshots
- Business model
- Traction/validation
- Competitive landscape
- Team
- Financial projections
- Ask and use of funds
Supporting Documents
- Executive Summary — 1-2 page overview for cold outreach
- One-Pager — Single page with key highlights
- Detailed Financial Model — Spreadsheet with assumptions
- Product Demo Video — 2-3 minute walkthrough
- Technical Deep-Dive Deck — For technical due diligence
Data Room Preparation
- Organize all documents in secure data room (DocSend, Google Drive, Notion)
- Cap table (current and pro-forma)
- Incorporation documents
- Any existing contracts or LOIs
- Team bios and LinkedIn profiles
- Technical architecture documents
- Financial projections with assumptions
Fundraising Logistics
- Target investor list (angels, pre-seed funds, AI-focused VCs)
- Warm introduction tracking spreadsheet
- Email templates for outreach
- FAQ document for common investor questions
- SAFE or convertible note terms prepared
Phase 6: Launch Preparation (Week 14-18)
Marketing Materials
- Landing page (coming soon / waitlist)
- Product marketing website
- Blog post: “Why We Built Recall”
- Technical blog post: “The Architecture Behind Recall”
- Social media accounts (Twitter/X, LinkedIn)
- Press kit with logos, screenshots, boilerplate
Community Building
- Discord or Slack community setup
- GitHub discussions enabled
- Documentation site (GitBook, Docusaurus, or similar)
- Developer onboarding guide
Launch Strategy
- Launch timeline with milestones
- Beta user recruitment plan
- Product Hunt launch preparation
- Hacker News launch post draft
- Influencer/developer outreach list
Metrics & Analytics
- Define key metrics (MAU, retention, API calls, etc.)
- Analytics implementation plan
- Dashboard for tracking metrics
- Feedback collection system
Phase 7: Post-Launch & Growth (Ongoing)
Operations
- Customer support system
- Bug tracking and triage process
- Feature request tracking
- Changelog and release notes process
Iteration
- User feedback synthesis process
- Roadmap prioritization framework
- A/B testing infrastructure
- Performance monitoring and alerting
Scaling Preparation
- Hiring plan document
- Onboarding documentation for new team members
- Infrastructure scaling playbook
- Enterprise sales playbook (when ready)
Key Documents Summary
Technical (Must Have for MVP)
- Technical Architecture Document
- Product Requirements Document
- Database Schema
- API Specification
- Recall File Structure Spec
- Defining Memory Spec
- Retrieval System Spec
Business (Must Have for Fundraising)
- Pitch Deck
- Executive Summary
- Financial Model
- Competitive Analysis
- Go-to-Market Strategy
Legal (Must Have Before Launch)
- Privacy Policy
- Terms of Service
- Company Incorporation
- Trademark Filing
Suggested Timeline
| Phase | Duration | Focus |
|---|---|---|
| Phase 0 | Week 1-2 | Foundation & Setup |
| Phase 1 | Week 2-4 | Technical Documentation |
| Phase 2 | Week 4-6 | Business Documentation |
| Phase 3 | Week 5-7 | Legal & Compliance |
| Phase 4 | Week 6-14 | Product Development |
| Phase 5 | Week 12-16 | Fundraising Materials |
| Phase 6 | Week 14-18 | Launch Preparation |
| Phase 7 | Week 18+ | Post-Launch Growth |
Total Time to Public Launch: ~18-20 weeks (5 months)
Next Immediate Actions
- Finish Technical Architecture Document (today)
- Create GitHub repository (this week)
- Register domain name (this week)
- Begin MVP development (next week)
- Draft pitch deck outline (within 2 weeks)
This checklist is a living document. Update as items are completed and new requirements emerge.